Bharat Petroleum Corporation Limited (BPCL) issued bids for Engineering, Procurement, Construction, Operation and Maintenance (EPCOM) for setting up organic municipal solid waste based Compressed Biogas (CBG) plant on October 27, 2026. The last date for bid submission is November 17, 2026.

The mechanical completion period is 12 months and commissioning period is 15 months.

The CBG plant is being set up in Kovallam in Kerala with a capacity of 150 tonnes per day (tpd)