Tripura Natural Gas Company Limited (TNGCL) is likely to commence piped natural gas (PNG) supply in Panisagar and Aizwal by early 2028. 

Under the North-East natural gas pipeline grid project a pipeline is being laid connecting Mizoram with TNGCL at an estimated cost of Rs 4.91 billion. The pipeline is expected to reach Mamit town by April 2027 and Sihhmui in Aizawl district by April 2028.

PNG supply is expected to commence post commission of the pipeline connecting Mizoram and TNGCL.

The North-East natural gas pipeline grid involves development, Operation and Maintenance (O&M) of a natural gas pipeline connecting eight states viz. Arunachal Pradesh, Assam, Manipur, Meghalaya, Mizoram, Nagaland, Sikkim and Tripura at an investment of Rs 100 billion. It is being implemented by IGGL, a joint venture (JV) company of Indian Oil Corporation Limited (IOCL), Oil and Natural Gas Corporation Limited (ONGC), GAIL (India) Limited, Oil India Limited (OIL) and Numaligarh Refinery Limited (NRL).