Petronet LNG Limited (PLL) has submitted proposal to the Petroleum and Natural Gas Regulatory Board (PNGRB) for Gopalpur Liquefied Natural Gas (LNG) Terminal- Hinjlil Natural Gas Pipeline Project.

Besides, PNGRB has initiated the public consultation process for the same.

PLL plans to lay a 36 km tie in connectivity natural gas pipeline from the upcoming Gopalpur floating storage and regasification based LNG terminal to GAIL (India) Limited’s Srikakulam Angul natural gas pipeline at Hinjli, intermediate pigging (IP) station -3, chainage (Ch) 245 from Angul in the state of Odisha with peak production capacity of 20 million standard cubic meters a day (mmscmd).