Kopek Polyplast has submitted proposal to the Petroleum and Natural Gas Regulatory Board (PNGRB) for the Gamnewala Gas Collecting System (GCS)- Ramgarh Natural Gas Pipeline Project (Kopek Polyplast).

Besides, PNGRB has initiated the public consultation process for the same.

Kopek Polyplast plans to lay 125 mm outside diameter (OD), 17.227 km natural gas pipeline from Oil and Natural Gas Corporation Limited’s (ONGC) Gamnewala GCS to its upcoming plant at Ramgarh, Jaisalmer in Rajasthan with system capacity of 20,000 standard cubic meters per day (scmd).